North-south run of Bear Branch completed in 2011 (note the width of the deforestation)
North-south run of Bear Branch 2023 (note the small size of trees after 12 years)
North-south run of Bear Branch 2011
North-south run of Bear Branch 2011
Green areas indicate Limits of Disturbance (LOD). Actual LOD may be less.